![]() ![]() Centralized Traffic Control System (CTC) /Train Management System (TMS)Īs a prelude to taking up the modernization work of signalling system on a pan-India basis, 4 works of total 640 Route km at a total cost of Rs 1,810 crore have been sanctioned as pilot projects in supplementary works programme 2018-19 for extensive trials. Long Term Evolution (LTE) based Mobile Train Radio Communication (MTRC) System Remote Diagnostic & Predictive Maintenance System Accordingly, a work of modernization of signalling system on entire Indian Railway network has been included in works programme 2018-19 at a cost of Rs 77,912 Crores, to be implemented after approval of NITI Aayog, Extended Board for Railways (EBR) and sanction of CCEA.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |